Govt. to open FAME-III policy in 1-2 months: Heavy Industries minister ‘Kumaraswamy’
"The centre is anticipated to open the much-awaited third phase of the Faster Adoption and Manufacturing of (Hybrid and) Electric ...
"The centre is anticipated to open the much-awaited third phase of the Faster Adoption and Manufacturing of (Hybrid and) Electric ...
© 2016 - 2024 AutoEV Times | All Rights Reserved.