GRIDCO Limited has invited bids for consultancy services to conduct an Environmental and Social Impact Assessment (ESIA) for the proposed 225 MW Upper Indravati Floating Solar Photovoltaic and Battery Energy Storage System (BESS) Project in Odisha. The assessment will cover the proposed project, its power evacuation infrastructure and associated transmission lines across Nabarangpur and Kalahandi districts.

The Request for Proposal (RFP), issued on October 16, 2026, seeks a qualified consultant to assess potential environmental and social impacts and recommend appropriate mitigation measures. The study will be carried out in accordance with applicable Indian regulations, the International Finance Corporation’s Performance Standards 2012 and the World Bank Group’s Environmental, Health and Safety Guidelines.

The consultancy scope includes assessments of the project’s physical, biological and socio-economic environment. The selected consultant will examine potential impacts on reservoir water quality, aquatic ecosystems, biodiversity and local livelihoods. The assignment also includes a Critical Habitat Assessment to identify ecologically sensitive areas, along with hydrodynamic water quality modelling and oil spill modelling related to synthetic transformer oils.

Battery energy storage safety and climate-related risks are also included in the assessment. The consultant will evaluate potential hazards associated with battery fires, thermal runaway, hazardous waste management and other relevant operational risks. A Climate Change Risk Assessment will examine potential vulnerabilities and identify appropriate adaptation measures for the proposed project.

The selected consultant will also prepare environmental and social management documents, including an Environmental and Social Management Plan (ESMP), Stakeholder Engagement Plan (SEP), Livelihood Restoration Plan (LRP) and Indigenous Peoples Development Plan (IPDP). These documents will establish measures for managing identified impacts, engaging stakeholders and addressing relevant livelihood and community concerns.

According to the published tender details, the pre-bid meeting is scheduled for October 30, 2026, at 11:00 AM, and the deadline for bid submission is November 17, 2026, at 3:00 PM. The tender document costs ₹10,000 plus 18% GST, while the required Earnest Money Deposit (EMD) is ₹1 lakh. The consultancy is intended to help GRIDCO identify environmental and social risks and establish suitable mitigation measures before the proposed floating solar and battery storage project progresses further.